CV Jaya Bearing Utama

33 purchase orders

VND-023 · Surabaya · Mesin & Suku Cadang

AverageFlaggedActive

Overall performance is mixed — solid in some areas, weak in others; review before renewing at current terms.

Overall rank

#16 of 40

Purchase orders
33
Materials
25
PO value
Rp 60.460.479
Groups supplied
10· 0 as primary
Last PO
2 Jul 2026

Price trend

Monthly average unit price, PO volume, and price ratio vs. reference.

Average

Rp 2.239.548

Highest

Rp 4.382.723

Lowest

Rp 41.957

Start → end

+25.5%

Avg unit price per month

PO lines per month

Avg price ratio per month

Dashed line = 1.00 reference. Below the line means cheaper than reference.

Score per dimension

Percentile rank against every vendor and every PO — weighted into the overall score.

  • Costweight 40%#26 of 40
    42
    16.9 / 40 pts

    Average price runs 2.7% above reference — noticeably overpaying versus expected cost, worth renegotiating.

  • Deliveryweight 30%#13 of 40
    60
    18.1 / 30 pts

    Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.

  • Qualityweight 30%#11 of 40
    64
    19.2 / 30 pts

    Average quality rating is 5.2/10 — generally solid, with occasional minor issues.

Operational metrics

Avg unit price
Rp 1.832.136
Price variance
8.7%
Price ratio
1.03
Quality rating
5.2/10
Lead time PO → delivery
7.2 days
Lead time release → GR
3.6 days
On-time rate
60.6%
Avg delay
1.5 days

PO history

33 PO lines · 22 flagged · Rp 60 Jt total

Showing 12 of 33 lines · Rp 60 Jt