CV Surya Komponen Mandiri

19 purchase orders

VND-015 · Klaten · Mesin & Suku Cadang

PoorFlaggedActive

Overall performance is weak — cost, delivery, or quality issues are dragging this vendor down; reconsider for renewal.

Overall rank

#36 of 40

Purchase orders
19
Materials
17
PO value
Rp 45.768.329
Groups supplied
9· 0 as primary
Last PO
14 Jun 2026

Price trend

Monthly average unit price, PO volume, and price ratio vs. reference.

Average

Rp 2.442.770

Highest

Rp 4.403.085

Lowest

Rp 135.961

Start → end

+2866.6%

Avg unit price per month

PO lines per month

Avg price ratio per month

Dashed line = 1.00 reference. Below the line means cheaper than reference.

Score per dimension

Percentile rank against every vendor and every PO — weighted into the overall score.

  • Costweight 40%#38 of 40
    14
    5.6 / 40 pts

    Average price runs 5.9% above reference — this vendor is significantly overpriced, budget impact is real and recurring.

  • Deliveryweight 30%#9 of 40
    64
    19.2 / 30 pts

    Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.

  • Qualityweight 30%#33 of 40
    30
    9.0 / 30 pts

    Average quality rating is 5.4/10 — quality issues are frequent, rework and return cost risk is material.

Operational metrics

Avg unit price
Rp 2.408.859
Price variance
9.9%
Price ratio
1.06
Quality rating
5.4/10
Lead time PO → delivery
8.5 days
Lead time release → GR
2.9 days
On-time rate
68.4%
Avg delay
1.6 days

PO history

19 PO lines · 13 flagged · Rp 46 Jt total

Showing 12 of 19 lines · Rp 46 Jt