PT Aneka Gas Teknik

24 purchase orders

VND-037 · Cilegon · Kimia

PoorFlaggedActive

Overall performance is weak — cost, delivery, or quality issues are dragging this vendor down; reconsider for renewal.

Overall rank

#40 of 40

Purchase orders
24
Materials
15
PO value
Rp 47.718.797
Groups supplied
7· 1 as primary
Last PO
2 Jul 2026

Price trend

Monthly average unit price, PO volume, and price ratio vs. reference.

Average

Rp 2.036.150

Highest

Rp 4.456.626

Lowest

Rp 646.759

Start → end

+56.3%

Avg unit price per month

PO lines per month

Avg price ratio per month

Dashed line = 1.00 reference. Below the line means cheaper than reference.

Score per dimension

Percentile rank against every vendor and every PO — weighted into the overall score.

  • Costweight 40%#33 of 40
    31
    12.3 / 40 pts

    Average price runs 1.1% above reference — this vendor is significantly overpriced, budget impact is real and recurring.

  • Deliveryweight 30%#23 of 40
    46
    13.8 / 30 pts

    Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.

  • Qualityweight 30%#40 of 40
    4
    1.2 / 30 pts

    Average quality rating is 4.5/10 — quality issues are frequent, rework and return cost risk is material.

Operational metrics

Avg unit price
Rp 1.988.283
Price variance
9.7%
Price ratio
1.01
Quality rating
4.5/10
Lead time PO → delivery
7.9 days
Lead time release → GR
3.6 days
On-time rate
45.8%
Avg delay
1.3 days

PO history

24 PO lines · 19 flagged · Rp 48 Jt total

Showing 12 of 24 lines · Rp 48 Jt