VND-036 · Batam · Instrumentasi
Overall performance is mixed — solid in some areas, weak in others; review before renewing at current terms.
Overall rank
#25 of 40
- Purchase orders
- 24
- Materials
- 19
- PO value
- Rp 52.319.556
- Groups supplied
- 9· 0 as primary
- Last PO
- 29 Jun 2026
Price trend
Monthly average unit price, PO volume, and price ratio vs. reference.
Average
Rp 2.047.731
Highest
Rp 4.007.580
Lowest
Rp 204.755
Start → end
+68.4%
Avg unit price per month
PO lines per month
Avg price ratio per month
Dashed line = 1.00 reference. Below the line means cheaper than reference.
Score per dimension
Percentile rank against every vendor and every PO — weighted into the overall score.
- Costweight 40%#9 of 406827.2 / 40 pts
Average price runs 0.1% above reference — a bit rich but still reasonable, worth keeping an eye on.
- Deliveryweight 30%#27 of 404011.9 / 30 pts
Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.
- Qualityweight 30%#35 of 40288.3 / 30 pts
Average quality rating is 5.0/10 — quality issues are frequent, rework and return cost risk is material.
Operational metrics
- Avg unit price
- Rp 2.179.981
- Price variance
- 8.3%
- Price ratio
- 1.00
- Quality rating
- 5.0/10
- Lead time PO → delivery
- 7.5 days
- Lead time release → GR
- 4.5 days
- On-time rate
- 62.5%
- Avg delay
- 1.9 days
PO history
24 PO lines · 15 flagged · Rp 52 Jt total
Showing 12 of 24 lines · Rp 52 Jt
Material groups supplied
Rank is recomputed within each group — can differ a lot from the overall rank.
- #1 of 22
Elektrikal & Instrumentasi
MFG-01 · 4 PO lines
- #2 of 19
Alat Berat & Komponen
MFG-09 · 3 PO lines
- #12 of 15
Fastener & Perpipaan
MFG-03 · 4 PO lines
- #13 of 20
Plastik & Karet
MFG-06 · 3 PO lines
- #20 of 23
Mesin & Suku Cadang
MFG-02 · 3 PO lines
- #20 of 21
Logam & Pelat
MFG-04 · 3 PO lines
- Thin evidence
Alat Teknik & Perkakas
MFG-07 · 2 PO lines
- Thin evidence
Kimia & Pelumas
MFG-05 · 1 PO line
- Thin evidence
Material Bangunan
MFG-08 · 1 PO line