VND-008 · Bekasi · Plastik & Karet
Overall performance is mixed — solid in some areas, weak in others; review before renewing at current terms.
Overall rank
#26 of 40
- Purchase orders
- 20
- Materials
- 17
- PO value
- Rp 39.062.638
- Groups supplied
- 8· 0 as primary
- Last PO
- 17 Jun 2026
Price trend
Monthly average unit price, PO volume, and price ratio vs. reference.
Average
Rp 1.975.179
Highest
Rp 4.512.075
Lowest
Rp 109.433
Start → end
-39.4%
Avg unit price per month
PO lines per month
Avg price ratio per month
Dashed line = 1.00 reference. Below the line means cheaper than reference.
Score per dimension
Percentile rank against every vendor and every PO — weighted into the overall score.
- Costweight 40%#36 of 402811.3 / 40 pts
Average price runs 1.4% above reference — this vendor is significantly overpriced, budget impact is real and recurring.
- Deliveryweight 30%#9 of 406419.2 / 30 pts
Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.
- Qualityweight 30%#20 of 405616.7 / 30 pts
Average quality rating is 6.3/10 — some inconsistency in received-goods condition, monitor closely.
Operational metrics
- Avg unit price
- Rp 1.953.132
- Price variance
- 9.9%
- Price ratio
- 1.01
- Quality rating
- 6.3/10
- Lead time PO → delivery
- 7.9 days
- Lead time release → GR
- 3.3 days
- On-time rate
- 65.0%
- Avg delay
- 0.9 days
PO history
20 PO lines · 12 flagged · Rp 39 Jt total
Showing 12 of 20 lines · Rp 39 Jt
Material groups supplied
Rank is recomputed within each group — can differ a lot from the overall rank.
- #1 of 19
Jasa & Lain-lain
MFG-10 · 3 PO lines
- #3 of 22
Elektrikal & Instrumentasi
MFG-01 · 3 PO lines
- #15 of 21
Logam & Pelat
MFG-04 · 5 PO lines
- Thin evidence
Fastener & Perpipaan
MFG-03 · 2 PO lines
- Thin evidence
Kimia & Pelumas
MFG-05 · 2 PO lines
- Thin evidence
Material Bangunan
MFG-08 · 2 PO lines
- Thin evidence
Alat Berat & Komponen
MFG-09 · 2 PO lines
- Thin evidence
Mesin & Suku Cadang
MFG-02 · 1 PO line