PT Maju Terus Pengecoran

25 purchase orders

VND-032 · Ceper · Logam & Baja

AverageFlaggedActive

Overall performance is mixed — solid in some areas, weak in others; review before renewing at current terms.

Overall rank

#17 of 40

Purchase orders
25
Materials
19
PO value
Rp 39.876.063
Groups supplied
10· 1 as primary
Last PO
15 Jul 2026

Price trend

Monthly average unit price, PO volume, and price ratio vs. reference.

Average

Rp 1.653.306

Highest

Rp 3.285.582

Lowest

Rp 121.216

Start → end

+134.8%

Avg unit price per month

PO lines per month

Avg price ratio per month

Dashed line = 1.00 reference. Below the line means cheaper than reference.

Score per dimension

Percentile rank against every vendor and every PO — weighted into the overall score.

  • Costweight 40%#1 of 40
    96
    38.5 / 40 pts

    Average price is at or below the reference price — pricing is on target and cost is predictable.

  • Deliveryweight 30%#32 of 40
    30
    9.0 / 30 pts

    Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.

  • Qualityweight 30%#36 of 40
    19
    5.8 / 30 pts

    Average quality rating is 4.3/10 — quality issues are frequent, rework and return cost risk is material.

Operational metrics

Avg unit price
Rp 1.595.043
Price variance
7.5%
Price ratio
0.95
Quality rating
4.3/10
Lead time PO → delivery
9.4 days
Lead time release → GR
3.4 days
On-time rate
60.0%
Avg delay
1.3 days

PO history

25 PO lines · 16 flagged · Rp 40 Jt total

Showing 12 of 25 lines · Rp 40 Jt