VND-018 · Bogor · Plastik & Karet
Overall performance is solid, though a subset of POs crossed a risk threshold — review before renewing at current terms.
Overall rank
#2 of 40
- Purchase orders
- 23
- Materials
- 18
- PO value
- Rp 35.735.476
- Groups supplied
- 9· 0 as primary
- Last PO
- 28 Jul 2026
Price trend
Monthly average unit price, PO volume, and price ratio vs. reference.
Average
Rp 1.626.271
Highest
Rp 3.738.241
Lowest
Rp 159.863
Start → end
-67.9%
Avg unit price per month
PO lines per month
Avg price ratio per month
Dashed line = 1.00 reference. Below the line means cheaper than reference.
Score per dimension
Percentile rank against every vendor and every PO — weighted into the overall score.
- Costweight 40%#2 of 408634.4 / 40 pts
Average price is at or below the reference price — pricing is on target and cost is predictable.
- Deliveryweight 30%#24 of 404513.5 / 30 pts
Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.
- Qualityweight 30%#12 of 406319.0 / 30 pts
Average quality rating is 6.5/10 — generally solid, with occasional minor issues.
Operational metrics
- Avg unit price
- Rp 1.553.716
- Price variance
- 8.3%
- Price ratio
- 0.96
- Quality rating
- 6.5/10
- Lead time PO → delivery
- 9.4 days
- Lead time release → GR
- 3.2 days
- On-time rate
- 60.9%
- Avg delay
- 2.0 days
PO history
23 PO lines · 13 flagged · Rp 36 Jt total
Showing 12 of 23 lines · Rp 36 Jt
Material groups supplied
Rank is recomputed within each group — can differ a lot from the overall rank.
- #3 of 15
Fastener & Perpipaan
MFG-03 · 4 PO lines
- #5 of 24
Alat Teknik & Perkakas
MFG-07 · 3 PO lines
- #10 of 15
Material Bangunan
MFG-08 · 3 PO lines
- #11 of 19
Alat Berat & Komponen
MFG-09 · 4 PO lines
- #12 of 23
Mesin & Suku Cadang
MFG-02 · 3 PO lines
- #20 of 22
Elektrikal & Instrumentasi
MFG-01 · 3 PO lines
- Thin evidence
Logam & Pelat
MFG-04 · 1 PO line
- Thin evidence
Kimia & Pelumas
MFG-05 · 1 PO line
- Thin evidence
Plastik & Karet
MFG-06 · 1 PO line