VND-009 · Jakarta Timur · Mesin & Suku Cadang
Overall performance is mixed — solid in some areas, weak in others; review before renewing at current terms.
Overall rank
#13 of 40
- Purchase orders
- 25
- Materials
- 20
- PO value
- Rp 60.321.808
- Groups supplied
- 9· 0 as primary
- Last PO
- 22 Jul 2026
Price trend
Monthly average unit price, PO volume, and price ratio vs. reference.
Average
Rp 2.402.718
Highest
Rp 4.136.939
Lowest
Rp 127.043
Start → end
-50.6%
Avg unit price per month
PO lines per month
Avg price ratio per month
Dashed line = 1.00 reference. Below the line means cheaper than reference.
Score per dimension
Percentile rank against every vendor and every PO — weighted into the overall score.
- Costweight 40%#13 of 406023.8 / 40 pts
Average price is at or below the reference price — pricing is on target and cost is predictable.
- Deliveryweight 30%#13 of 406018.1 / 30 pts
Deliveries arrive on the material benchmark pace or faster — no lead-time risk to production schedule.
- Qualityweight 30%#27 of 404613.8 / 30 pts
Average quality rating is 5.4/10 — some inconsistency in received-goods condition, monitor closely.
Operational metrics
- Avg unit price
- Rp 2.412.872
- Price variance
- 9.1%
- Price ratio
- 0.98
- Quality rating
- 5.4/10
- Lead time PO → delivery
- 8.7 days
- Lead time release → GR
- 2.8 days
- On-time rate
- 56.0%
- Avg delay
- 2.0 days
PO history
25 PO lines · 18 flagged · Rp 60 Jt total
Showing 12 of 25 lines · Rp 60 Jt
Material groups supplied
Rank is recomputed within each group — can differ a lot from the overall rank.
- #3 of 19
Jasa & Lain-lain
MFG-10 · 3 PO lines
- #8 of 21
Logam & Pelat
MFG-04 · 4 PO lines
- #11 of 16
Kimia & Pelumas
MFG-05 · 4 PO lines
- #13 of 24
Alat Teknik & Perkakas
MFG-07 · 3 PO lines
- #13 of 15
Material Bangunan
MFG-08 · 3 PO lines
- #15 of 19
Alat Berat & Komponen
MFG-09 · 3 PO lines
- #17 of 23
Mesin & Suku Cadang
MFG-02 · 3 PO lines
- Thin evidence
Elektrikal & Instrumentasi
MFG-01 · 1 PO line
- Thin evidence
Plastik & Karet
MFG-06 · 1 PO line